Systems achieved 100 man hour savings
Process: Aluminum GMAW Welding/Material Handling
Industry: Tractor/Trailer
Parts: Aluminum Flat Bed Trailers (48-53 ft in Length)
Company: Manufacturer of Flatbed Aluminum Trailers
Project Results
Robotic system meets or exceeds project requirements for welding trailer components and material handling. Visual welds along entire length of 53 ft of trailer. Robot systems and material handling systems for new plant start up achieved 100 man hour savings per trailer versus 100% manual operations company previously achieved.
Challenges
Understanding component repeatability and which processes could be automated and which ones should remain manual. Aluminum welding of a product required strategic placement of weld wire and torch angle requirements. Arrange equipment in a start up facility to optimize safety, material handling, and throughput - while minimizing manning requirements.
Tennessee Rand successfully engineered, fabricated, programmed, and installed this complex multi operational system at a trailer manufacturer in the US. Experience in aluminum welding was vital for this challenging project. As the individual components were previously manually welded, they were not conducive for robotic welding and required much engineering investigation to determine which processes could be automated. Tennessee Rand’s tooling experts providing a tooling design that automated welding and assembly where applicable and achieved dimensional repeatability. Our
Engineers also developed material handling systems utilizing large
headstock/tailstock carts to hold and locate the entire 53’ trailer to
assist with the final assembly processes.
The process was broken down into 4 main areas:
- Material handling devices utilizing overhead crane
- Robotic welding
of spools and pockets on side rail assemblies
- Gantry wed system
that welded entire seam welds along 53’ length and automatically
drilled and screwed planks into correct position
- Material Handling carts that allowed customer to manipulate entire 53’ Flatbed Trailer to assist in final assembly operations.
The Side Rail cell was equipped with 2 Panasonic robots with aluminum weld package. The
Gantry operation consisted of 4 fixed tooling guns with seam tracking
and servo controlled locations for drilling and screwing operations.
|